Company News

Rotor is On!

Published October 29th, 2019 by Baschteam

A successful installation of the new 3 meter rotor on the Gen 1 at Clarkson University capped off a stellar fall day in Potsdam, NY! The turbine was lowered, the old rotor changed out and the new blades built into the rotor and installed without too many hitches at all. Thanks to all the crew and students for helping out in a very professional manner! Note that Mark Hebel, the shop tech extraordinaire here at Clarkson, is featured getting his hands dirty in every shot! 


Partners and Associations

Copyright © 2024 Ducted Wind Turbines, Inc. | All Rights Reserved.

Website by

MENU